Draft at home. Verify in the data center.
A distributed inference project for structured batch jobs. A home GPU proposes the next tokens. A larger model checks the candidates before they become part of the answer.
Research preview · Production availability and token launch are pending validation.
What the network has to prove
The planned benchmark uses 10,000 prompts over residential connections. It compares remote drafting with the same target model serving the same workload on its own.
- At least 70% of proposed tokens accepted
- At least 1.6× end-to-end throughput
- More valid Pearl mining tiles per joule
These are targets. Hardware results are pending.
First simulation
With 12 proposed tokens per round and an assumed 95% chance of accepting each successive token, the timing model accepted 73.3% of all proposals. Increasing simulated round-trip delay from 20 to 80 ms reduced modeled speedup from 3.39× to 1.63×.
Each scenario uses the same 10,000 synthetic job lengths. Target-only decoding is assumed to take 20 ms per token, drafting 1 ms per token, and verification 24 ms per round. These are single-stream estimates. Actual model quality, serving throughput and mining efficiency require hardware measurement.
Download assumptions and all nine scenarios (JSON)